BIM for facilities management
Contents |
[edit] The Role of Building Information Modelling in Modern Facilities Management
Building Information Modelling has evolved beyond its traditional application in architectural design and construction coordination. Today, it serves as the foundational data framework for long term building operations. For modern estates, applying digital models to Facilities management bridges the critical gap between the final stages of physical construction and the continuous demands of operational maintenance.
An intelligent facility model consolidates vast amounts of fragmented project data into a single navigable digital environment. This consolidation empowers maintenance teams to access critical specifications, including manufacturer details, maintenance requirements, and warranty periods, directly from the three dimensional geometric interface. By transforming static geometry into a dynamic Asset information model AIM, property owners can establish a reliable baseline for strategic lifecycle planning.
[edit] Integrating Asset Data and Standardised Schemas
The true value of a digital handover relies entirely on the accuracy and structure of its underlying asset data. Geometric representation alone is insufficient for effective facility operations. Building components must carry specific metadata configured to align with an organisation's Master Tag Register or specific Asset Information Requirements.
Structuring this data correctly often involves specific compliance standards, most notably COBie. This international standard ensures that crucial spatial and equipment data is systematically formatted so that non technical operational staff can interpret it easily. A comprehensive asset data delivery typically includes:
- Three dimensional models containing intelligent parameters for architectural, structural, and mechanical elements, mapped directly to specific facility management tags.
- Detailed spreadsheet workbooks that compile one row per physical asset, allowing maintenance managers to review and update component histories in bulk outside the native authoring software.
- Standardised export files containing the specific spatial hierarchies and system classifications required by operational databases.
- Comprehensive handover documentation that clearly defines every parameter, tag, and code embedded within the digital deliverable, ensuring that future data entry remains consistent.
[edit] Transitioning to Operational Maintenance Platforms
The ultimate objective of structuring facility data is to facilitate a seamless transition from the construction phase into dedicated Computer Aided Facility Management or Computerised Maintenance Management System platforms. When asset data is configured correctly, facility operators experience significantly smoother handovers, drastically reducing the typical information loss associated with traditional paper based project completions.
Loading a verified digital model into an operational platform provides maintenance planners with immediate spatial context. Teams can locate concealed mechanical assets, generate accurate equipment schedules, and track component depreciation in real time. This integrated approach ensures that the digital record evolves alongside the physical building, maintaining operational relevance decades after initial construction.
[edit] Overcoming Challenges in Existing Infrastructure
While applying digital methodologies to new construction is relatively straightforward, extending these benefits to existing buildings presents complex technical challenges. Older facilities typically lack accurate digital models, relying instead on outdated two dimensional drawings, scattered spreadsheets, or incomplete maintenance manuals.
To create a functional Digital twin for an existing building, engineering professionals must deploy reality capture technologies. Laser scanning generates highly precise point cloud data, capturing the exact spatial conditions of the current infrastructure. However, extracting intelligent asset data from millions of laser points requires an intensive, systematic reconstruction process to ensure that the resulting geometry reflects actual on site dimensions and spatial relationships accurately.
[edit] The Standardised Data Integration Process
Transforming raw reality capture data into a fully functional facility management tool follows a strict procedural workflow. This structured methodology guarantees that all non graphical data aligns perfectly with the physical geometry.
- Defining information scopes establishes the specific building components that require asset tracking, determining the necessary parameter sets such as serial numbers or zone classifications.
- Extracting existing family parameters allows engineering teams to map raw geometry against the client's asset register systematically.
- Parameter grouping and cleanup conducted within spreadsheet environments ensures that all data formatting remains consistent before re integration.
- Populating asset data involves transcribing technical details from legacy maintenance documents and site photographs into the structured digital templates.
- Synchronising data back into the authoring software embeds the refined operational information directly into the three dimensional components.
- Validating data quality ensures that all required fields are correctly populated and that parameter values remain uniform across the entire facility dataset.
- Exporting formatted data prepares the final digital files for direct ingestion into the designated maintenance management platform.
- Handover support provides facility teams with the necessary reference materials to maintain the digital asset moving forward.
[edit] Quality Assurance and Industry Standards
Delivering reliable operational data requires rigorous quality governance. Throughout the data integration process, dedicated quality control specialists must verify that all parameter values maintain strict consistency and that the geometric accuracy of the modelled elements remains within acceptable dimensional tolerances relative to the source laser scans.
Furthermore, all digital information exchanges should occur within a secure Common data environment CDE. Adhering to international information management frameworks ensures that the final digital asset provides a secure, reliable foundation for long term operational efficiency, preventing the data degradation that typically plagues older facility portfolios.
[edit] Related articles on Designing Buildings
- BIM and facilities management
- Asset information model
- Asset management
- Computer aided facilities management
- Creating an asset register for construction projects
- Digital twin
- Facilities management
- Facility management and technology
- COBie
- Operation, maintenance and training (OMT)
References: Scan to BIM for Facility Management Services - Published by ViBIM
BIM Directory
[edit] Building Information Modelling (BIM)
[edit] Information Requirements
Employer's Information Requirements (EIR)
Organisational Information Requirements (OIR)
Asset Information Requirements (AIR)
[edit] Information Models
Project Information Model (PIM)
[edit] Collaborative Practices
Industry Foundation Classes (IFC)




